Unit-2 Progressive Hospital Case Study Unit-2 Progressive Hospital Case Study has a failover / fault tolerance system in place to ensure a link between the two sites is maintained in the event of a failure in the dedicated fibre connection. An entirely separate connection between the sites is created...